> January 28: Project Photos

> January 28: Project Updates

Minnesota Avenue Revitalization Phase 1
from A St., SE to 300 ft. south of Benning Rd., NE

PROJECT UPDATE

Saturday, January 28 – Friday, February 2, 2017
(Work is NOT scheduled for Saturday, January 28, 2017)

All work subject to change (weather permitting)

  • Complete installation of stormdrain inlet I-39 @ Clay Pl., east of Minn. Ave.;
  • Continue sidewalk reconstruction @ the west side of Minn. Ave. b/t A St. & Benning Rd.;
    •  During sidewalk reconstruction, pedestrians will be diverted to temporary protected walkways in the new roadway (on the same side of the street).
  • Continue reconstruction @ the west side of Minn. Ave. including roadway reconstruction (except final asphalt surface) at areas adjacent to recently installed stormdrain inlets in front of the Allen House and Greenway Center and @ the E. Capitol St. north and south service roads and continue construction of LID planter box interior walls and streetlight/traffic signal foundations;
  • Continue installation of traffic signal communication cables through new manholes & ductbanks b/t Ames St. & Ridge Rd.

> January 21: Project Photos

> January 21: Project Updates

Minnesota Avenue Revitalization Phase 1
from A St., SE to 300 ft. south of Benning Rd., NE

PROJECT UPDATE

Saturday, January 21 – Friday, January 27, 2017
(Work is NOT scheduled for Saturday, January 21, 2017)

All work subject to change (weather permitting)

  • Continue west side bridge and roadway work to include sidewalk, wheelchair ramp and traffic signal foundation installations;
  • Continue installation of traffic signal communication cables through new manholes & ductbanks b/t Dix St. & Ridge Rd.;
  • Continue sidewalk reconstruction along the west side of Minn. Ave. b/t A St. & Blaine St. & Ridge Rd.;
    • During sidewalk construction, pedestrians will be diverted to temporary protected walkways in the new roadway (on the same side of the street).

> January 14: Project Photos

> January 14: Project Updates

Minnesota Avenue Revitalization Phase 1
from A St., SE to 300 ft. south of Benning Rd., NE

PROJECT UPDATE

Saturday, January 14 – Friday, January 20, 2017
(Work is scheduled for Saturday, January 14, 2017)
(Work is NOT scheduled for Saturday, January 21, 2017)

All work subject to change (weather permitting)

  •  Continue west side bridge work to include sidewalk, wheelchair ramp and traffic signal installations;
  • Continue installation of traffic signal communication cables through new manholes & ductbanks b/t Dix St. & Ridge Rd.;
  • Continue sidewalk reconstruction along the west side of Minn. Ave. b/t A St. & Blaine St. and along Ridge Rd., west of Minn. Ave.;
    • During sidewalk construction, pedestrians will be diverted to temporary protected walkways in the new roadway (on the same side of the street).

> January 7: Project Photos

> January 7: Project Updates

Minnesota Avenue Revitalization Phase 1
from A St., SE to 300 ft. south of Benning Rd., NE

PROJECT UPDATE

Saturday, January 7 – Friday, January 13, 2017
(Work is scheduled for Saturday, January 7, 2017)

All work subject to change (weather permitting)

  • Continue Phase 3 (of 3) west-side/SB roadway related construction b/t A St. & Blaine St. including curb, gutter, wheelchair ramp and driveway construction and utility work including stormdrain (SD) inlets and pipe and streetlight/traffic signal conduit, foundation and pole installations;
  • Continue sidewalk reconstruction along the w. side of Minn. Ave. b/t A St. & Blaine St.;
    • During sidewalk construction, pedestrians will be diverted to temporary protected walkways in the new roadway (on the same side of the street).
  • Continue installation of SD manhole and inlet on Clay Pl., east of Minn. Ave.
  • Work on the Minn. Ave. Bridge over East Capitol St. is expected to resume during this period to include west side sidewalk widening and wheelchair ramp construction.